Happy Diwali from Indore Metro! Wishing you and your family light and joy. Check timings

← Service status

Indore Metro Yellow Line

The Yellow Line is Indore Metro's first corridor. 16 stations are now operational over ~17 km, from Devi Ahilya Bai Holkar Terminal to Radisson Square (Malviya Nagar Chauraha) — the 11 km extension opened on 6 September 2026. The remaining stations, onward to the Airport, are under construction (33.53 km / 29 stations when the full ring is complete).

16 of 29
Open
17.3 km
Open length
7:30 AM to 9:30 PM
Mon to Sat

About the Indore Metro Yellow Line

The Yellow Line is the first metro corridor in Indore, Madhya Pradesh, built by the Madhya Pradesh Metro Rail Corporation Limited (MPMRCL). When complete it will be 33.53 km long with 29 stations.

  • Open now: 16 stations, about 17.3 km, from Devi Ahilya Bai Holkar Terminal to Radisson Square (opened 2026-09-06).
  • Under construction: 13 stations onward to Rajwada, Indore Junction and the Airport.
  • Timings: 7:30 AM to 9:30 PM, trains approximately every 45 minutes.
  • Fares: ₹10 to ₹60, by distance. See the fare chart.
  • Tickets: QR tickets and smart cards at the gates.

Source: MPMRCL. myindoremetro.com is an independent guide, not affiliated with MPMRCL.